Househunting

In Flint, Michigan:

As the veteran of a brutal San Francisco home-buying odyssey, there’s no denying the appeal of a place where desperate Realtors sometimes offer up houses by the dozen. But this is more than a quest for cheap housing. I have an almost unhealthy attachment to Flint. I want to do something—anything—to help my hometown. Maybe a “summer place” in what has been ranked one of America’s most depressing cities can pump a little life into the local economy. And I fear that after 15 years in San Francisco—sometimes described as 49 square miles surrounded on all sides by reality—I’m losing touch with my roots, drifting uncomfortably far from the factory town my grandparents moved to at the turn of the 20th century.

How do I know this? Sometimes I fret about the high price of organic avocados. After growing up driving a Buick Electra 225, I now own a gutless four-cylinder Toyota Camry. And then there’s the fact that I’m so jittery in the place where I grew up that I’m sleeping with a bat.

There are some good neighborhoods there still, I think, it’s close to recreation up north (though Saginaw and Bay City more so) and it’s cheap living, if you can work from anywhere. Of course, you could even live up north (though the winters are tougher there than southeast Michigan). On the other hand, there are the Michigan taxes…

Obama’s Failed Gamble

Jimmy Pethokoukis:

Obama wagered that the deluge of money coming from the Federal Reserve would do the heavy lifting as far as stabilizing the financial sector and keeping the already apparent recession from turning into a real disaster. Voters would, thus, continue to support his policies to assert more government control over healthcare, heavily regulate energy through a costly cap-and-trade program and further intervene into the financial industry.

The gamble appears to have failed miserably, both economically and politically. The terrible tale of the tape: a) the current downturn is arguably the worse since the Great Depression; b) household wealth has fallen by $14 trillion during the past two years, including the first quarter of 2009; c) while the economy may not shrink as much this quarter as it did in the previous three months (-5.7 percent) or the final quarter of 2008 (-6.3 percent), unemployment is soaring; d) Obama himself said the jobless rate will hit 10 percent this year; d) even worse, the Federal Reserve sees it approaching 11 percent next year. (Recall, that the original White House economic analysis of the Obama economic plan never saw unemployment exceeding 8 percent if Obamanomics was passed by Congress.)

While I don’t mind him failing, since his policy goals are disastrous, I’m furious that it’s wrecking the economy anyway.

A Victim Of Obama’s Heavy Hand

The widow of the assassinated fly is suing the president:

“Bob was a wonderful husband and provider,” said the widow, Mrs. Vivian Vvzzvzwwzzz, wiping tears from her compound eyes. “Even though he was always busy at the Rose Garden turd pile, he always flew home in time to tuck in our maggots.”

The 17-day old widow said the grieving process since the murder has taken its toll.

“Although it’s been nearly 48 hours, I still get an empty feeling in my thorax everytime I think about it,” she said. “I feel like I’ve aged an entire week. Mating season is over, and here I am, stuck trying to raise 532 larvae on my own.”

Let’s just hope that the president doesn’t try to intimidate any witnesses this time.

More Crazy Cost Numbers

The New York Times has a story on yesterday’s Augustine hearing, and this jumped out at me:

In an interview, Steve Cook, manager of the Ares Project at the Marshall Space Flight Center in Huntsville, Ala., said that the cost estimate for developing the Ares I and seeing it through its first manned flight was $35 billion. Contrary to the claims of critics, he said, costs have not spiraled out of control.

Let’s ignore the tragic hilarity of that last statement, when we consider what the original cost estimate was when it was “simple, safe, soon.” He is admitting that the development cost, for Ares I alone, through first crewed flight, is thirty-five millibaracks. So how can that be reconciled with the Aerospace study which seems to imply that the total life cycle cost for fourteen flights is nineteen billion? If development alone is thirty-five, then using the assumptions I used in that other post, the LCC for fourteen flights would be over forty billion (almost three billion dollars per flight, for people who know how to divide). That compares to a cost of sixteen billion for the Delta option, or a little over a billion a flight (still ridiculous, of course). Why is it that we accept these kinds of numbers as though they’re perfectly reasonable, perfectly affordable? Particularly in light of the fact that SpaceX has gone a long way toward developing both the Dragon capsule and Falcon 9 for (at a guess) a percent or so of forty billion?

Anyway, I find that the most interesting thing about the Times reporting is that there is no mention of SpaceX or commercial alternatives. I guess they’re not worth covering. As for the “dueling power points,” my vote is “none of the above.”

[Update a while later]

OK, I was digging around to try to find what the original promises were for Ares I development costs, and I stumbled on to this. “Safe, Simple, Soon” is still up! And apparently being maintained and updated by someone (no doubt funded by ATK).

And it’s hilarious. It’s like reading Pravda in 1988.

Comrades! All is well!

The potato and beet crops were a record this year! Steel production is exceeding the Gorbachev five-year plan!

I’m going to save that page for posterity.

Anyway, does anyone have a link to an initial Ares I cost estimate, circa late 2005?

[Friday morning update]

“Rocket Man” has the numbers:

“In September 2005, NASA authorized the Ares I project to proceed with the development of a new human-rated crew launch vehicle with a 24.5-metric ton lift capability and a total budget of $14.4 billion for design, development, test, and evaluation (DDT&E), and production.” (GAO-08-51)

So the development cost estimates (including production? Of how many vehicles?) have more than doubled in less than four years. But the program is “under control.” And now the Aerospace numbers make sense. They were using the original DDT&E estimate for their trade, which (as usual) puts a NASA thumb on the scale in favor of Ares. The Aerospace study is now either worthless, or makes Ares look even worse; it does nothing to aid its cause.

Biting Commentary about Infinity…and Beyond!