Construction in slow motion; Bob Zimmerman notes the snail’s pace:
Orion’s budget these days is about $1 billion per year, with a total cost expected to reach $17 billion by the time the fourth capsule is built and launched in 2023, for a project first proposed in 2004.
In other words, it will take NASA and Lockheed Martin almost 20 years to build four capsules for the cost of $17 billion. That is absurd. Compare it to commercial space: The entire budget for all the commercial crew contracts, including both cargo contracts and the manned contract, is about half that, and will produce four different vehicles, all of which will be built and flying by 2019 at the latest. And in the case of Dragon and Cygnus, more than a dozen capsules have already flown.
Is there no one in Washington with the brain power to read these numbers and come to a rational decision about SLS/Orion? It costs too much and isn’t getting us into space. Moreover, at its pace and cost it isn’t doing anything to help the American aerospace industry. Better for Congress to put money into other things, or save it entirely and reduce the deficit and thus not waste it on this pork barrel garbage.
It’s not about building a capsule, or going to Mars. Or even beyond earth orbit.