Category Archives: Space

Thoughts On The Number Six

Over at Rockets and Such.

So, it goes from Ares 5 to Ares 6, and it still doesn’t satisfy the mission requirement. And now it has outgrown the MLP.

There’s a concept in the development of a space vehicle known as “chasing your tail,” in which the need to add something to the vehicle (like adequate structural strength, with margin) results in more weight, which results in the need for bigger or more engines to push it, which results in the need for more propellant capacity to accelerate the added mass, which results in…

And the design won’t close.

Now in fact, it is probably possible to get this design to close–bigger vehicles are easier in that regard than small ones. But regardless of the size of the vehicle, mission needs are always going to grow (and they still don’t really have solid numbers on the EDS/Altair/cargo requirements). So it won’t be able to get the mission concept (one and a half launch) to close, particularly as we move beyond the moon, even if it can be done for the moon.

The rationale for the heavy lifter has always been to avoid the complication of orbital assembly (apparently, the false lesson learned from our success with assembling ISS is that we should throw away all that experience, and take an entirely different approach for VSE). But it’s already a “launch and half” mission, needing both Ares 1 and Ares 56, so they’re not even avoiding it–they’re only minimizing it. And even if the lunar mission doesn’t outgrow the Ares 6, it won’t be able to do a Mars mission in a single launch. So if we need to learn to do orbital assembly (and long-term propellant storage) anyway, why postpone it? Why not take the savings from not developing an unneeded heavy lifter (and new crew launch vehicle), and invest it in orbital infrastructure, tools and technology to provide a flexible system that can be serviced by a range of launch vehicles, without the single-point failure of Ares? These are the kinds of issues that a new administrator will have to consider next year.

And don’t get me started on the Ares 1 problems:

The currently favored mitigation approaches – still undergoing a trade study – for thrust oscillation will add around 500 lbs to Orion for shock mounting on the crew seats and vital components.

So, because the geniuses behind this concept decided to put the crew on top of the world’s biggest organ pipe, they’ll add a quarter of a ton to an already-overweight vehicle with no margin, so that the astronauts will (might?) be able to survive watching the rest of the capsule being vibrated even more intensely around them.

There is a word for this. It starts with a “k” and ends with “ludge.” And then there’s this.

Thrust oscillation is now categorized as a 5×4 risk for the upper stage.

I’m not sure which axis is which in that formulation, but it either means that there is a very high likelihood of a catastrophic outcome, or that that it is probable that there will be a near-catastrophic outcome. And no mitigation has yet been found.

They really need to consider going from one and a half launches to (at least) two launches of a single medium-sized vehicle type. Two launches is two launches, it would save them a huge amount of development costs, provide much better economies of scale in operation and production, and get completely around the “stick” idea, which is proving to be a programmatic disaster waiting to happen, if it hasn’t already. Let us finally end the cargo cult of Apollo, and develop real infrastructure.

[Late morning update]

Here’s more discussion over at NASA Space Flight.

[Update a few minutes later]

In a post from a week ago, Chair Force Engineer has some related thoughts as well, on the wisdom of choosing solids at all:

The solid-liquid trade study is one that couldn’t have been adequately analyzed during the 60 days of the ESAS study, and will likely end up as an interesting footnote in the Ares story. The question is whether the Ares story will fall into the genre of historical nonfiction, or fantasy and tragedy. If the latter is true, perhaps liquids were the answer after all. But the decision to not cap the weight of Ares V (even at the expense of payload) is one that taxpayers shouldn’t forget if the massive rocket, and its shiny new infrastructure, ever get off the drawing board.

It seems pretty clear (as it did at the time) that the decision to build “the Stick” was pre-ordained, and that the sixty-day study was a rationalization, not a rationale, and that none of the CE&R recommendations were seriously considered. An Administrator Steidle would no doubt want to revisit it.

Len Cormier’s Final Flight Plan

I just got the sad news from Pat Kelley:

Len took his final journey this morning, passing peacefully. His family is going to have his ashes interred at Arlington cemetery, but I have no schedule. For those who wish to express condolences, you can reach his life partner, Anne Greenglass via email, [email me for the address if you want to do so–rs].

I tried to address this notice to all the people on my list, but I’m sure there are others I may have missed, so please forward this to anyone else you feel would want to know. I do intend to continue trying to get backing for Len’s last design (Space Van 2010) as a tribute.

Len was a truly unique man, and a rare breed these days. Always the gentleman, honest to a fault, and always ready to give credit where it was due (and sometimes even allowing the unworthy to take credit for his work, for the sake of an important effort). He is unreplaceable, and will be sorely missed.

Ad astra, cum laetitia, Len.

[Previous post here]

Len Cormier’s Final Flight Plan

I just got the sad news from Pat Kelley:

Len took his final journey this morning, passing peacefully. His family is going to have his ashes interred at Arlington cemetery, but I have no schedule. For those who wish to express condolences, you can reach his life partner, Anne Greenglass via email, [email me for the address if you want to do so–rs].

I tried to address this notice to all the people on my list, but I’m sure there are others I may have missed, so please forward this to anyone else you feel would want to know. I do intend to continue trying to get backing for Len’s last design (Space Van 2010) as a tribute.

Len was a truly unique man, and a rare breed these days. Always the gentleman, honest to a fault, and always ready to give credit where it was due (and sometimes even allowing the unworthy to take credit for his work, for the sake of an important effort). He is unreplaceable, and will be sorely missed.

Ad astra, cum laetitia, Len.

[Previous post here]

The Way Forward

Very little in this essay is new to people who have been following the arguments in space policy circles for years, but it’s useful to pull it all together into one place, and bring it up to date. I and many others have long advocated that we need to resurrect NACA (which was absorbed into NASA half a century ago) and start developing technology that can support private industry, as we did for aviation. With the new private space passenger vehicles now starting to be developed, the time is ripe for it, and Jeff Foust and Charles Miller have made a very powerful case. This should be must reading for both presidential campaigns.

[Update mid morning]

This piece I wrote a few years ago on the centennial of flight seems pertinent.

[Mid-afternoon update]

More commentary over at Jeff’s site, Space Politics.

What Is The New Space Suit?

In all of the reports I find on the award of the new suit contract to Oceaneering, I can’t find any technical details on it (I suppose a lot of the info for both competitors is embargoed for proprietary reasons). But from the pictures, it looks like a hard suit. Does anyone know? If so, that would be the second revolution. The first, of course, is Ham Standard/Sunstrand finally losing their decades-long monopoly, going back to Apollo. It’s nice to see David Clark back in the game as well, after all those decades. I wonder if they’ll be using a glove concept based on Peter Homer’s?

[Update in the afternoon]

Louise Riofrio has more thoughts. Apparently, though, this wasn’t a design competition–it was a competition to see which contractor was more generally qualified to build suits. Process over product…

Ceding The High Ground

Jeff Krukin writes that Europe is leaving NewSpace to the US, out of (among other things) foolish class envy:

the views expressed by European Commission Vice President Guenter Verheugen speak volumes about the attitudes of the European political establishment toward entrepreneurial space activity (NewSpace). Referring to public remarks by Guenter, Astrium Chief Executive Francois Auque said, “I was even told that this project was morally blameworthy because it targets an audience of the rich people.”

Well, that’s why many of our ancestors left Europe.

Schizophrenic

Jeff Foust has a tale of two bills. As he notes, the language in the authorization bill is great:

It is further the sense of Congress that United States entrepreneurial space companies have the potential to develop and deliver innovative technology solutions at affordable costs. NASA is encouraged to use United States entrepreneurial space companies to conduct appropriate research and development activities. NASA is further encouraged to seek ways to ensure that firms that rely on fixed-price proposals are not disadvantaged when NASA seeks to procure technology development.

I wonder if the part about fixed-price contracts was in response to pressure from XCOR specifically, or perhaps from the Personal Spaceflight Federation?

Anyway, nice as it sounds, the only bill that really counts is the appropriations bill, which (again as he notes) cuts COTS funding.